Sprayed concrete
This picture was taken after some of the concrete had been sprayed. Over the course of a week, there were eleven concrete trucks, which meant eleven layers of concrete were sprayed over the foam insulation and the rebar grid. This gave us four inches of concrete over the three inches of foam insulation. The final layer of concrete was mostly sand to smooth out the surface as much as possible.
0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home