Day after the floor was poured
On February 8, 2006, Kerry Kincaid and his two helpers, Cory and Brad, poured the floor. It started out as a nice day, but then it suddenly changed. A strong wind came up and the temperature dropped. My husband had to run into town to rent a heater to keep the cement warm. In this picture you can see the plumbing stubs and the pex pipe stubs for the in floor heating. They did a GREAT job on the floor!
0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home