Sunday, April 27, 2008

The passive solar floor


After the floor was leveled and insulated we put down a layer of plastic for a vapor barrier. Next came a layer of sand and then we started moving the cinder blocks in. This picture was taken when there were ONLY 8 pallets of cinder blocks left (there were 21 pallets to begin with).

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home