Sunday, April 27, 2008

Rough plumbing

Because the crew used a rotary scaffold to build the dome, some of the stubs for the plumbing had to be buried. After we insulated the doors and windows, we had to find the stubs and extend them. We also poured a cement pad 5'x18', seen in this picture. The pad would support a stone wall in the future.
On the cement pad is a stack of 1.5" insulation sheets that would be used to insulate the floor and a rotary laser level that was used to level the floor.